B101 bridge in Großenhain: demolition has begun
The load-bearing capacity of the bridge on the B101 is so endangered that demolition is the only option. Work begins just one day after the inspection.
Los mensajes se cargan...
The load-bearing capacity of the bridge on the B101 is so endangered that demolition is the only option. Work begins just one day after the inspection.
The load-bearing capacity of the bridge on the B101 is so endangered that demolition is the only option. Work begins just one day after the inspection.
The load-bearing capacity of the bridge on the B101 is so endangered that demolition is the only option. The closure affects not only car traffic but also rail traffic.