B101 bridge in Großenhain: demolition has begun
The load-bearing capacity of the bridge on the B101 is so endangered that demolition is the only option. Work begins just one day after the inspection.
Nachrichten werden geladen...
The load-bearing capacity of the bridge on the B101 is so endangered that demolition is the only option. Work begins just one day after the inspection.
The load-bearing capacity of the bridge on the B101 is so endangered that demolition is the only option. Work begins just one day after the inspection.
The load-bearing capacity of the bridge on the B101 is so endangered that demolition is the only option. The closure affects not only car traffic but also rail traffic.