Leag power plants are not all running at full load
At the onset of winter, the power plant units in Lusatia are not running at full capacity due to disruptions at the Jänschwalde and Boxberg sites. According to the operator Leag, a "minor malfunction" was detected in a boiler at the Jänschwalde ligni ..